LIVE STATUS: PERMIT REVIEW • 45-DAY BUYOUT COUNTDOWN • SUB-PERMITS OPEN
94 / 100
Div28 Winnability Score
91%
Buyout Openness Window
24–38
Est. Controlled Openings
$65K–$110K
Est. Division 28 Scope
Layer 1: Verified Municipal Ground Fact
| Permit Number |
7157464-CN (Seattle SDCI) |
| Filing Type & Status |
Commercial Alteration / Tenant Improvement — Plan Review In Progress |
| General Contractor |
Turner Construction Company (Seattle Commercial TI Division) |
| Declared Valuation |
$3,850,000.00 USD ($95.94 / RSF buildout density) |
| Official Scope Summary |
40,129 SF interior office tenant improvement, new conference center (assembly space), new interconnecting internal stair. Work includes partitions, doors, sidelights, casework, finishes, and structural supports for operable partition systems. |
Layer 2: Preconstruction Signal Audit
| Electrical Sub-Permit (ELE) |
UNFILED / NOT YET ISSUED (Zero electrical sub-permits recorded) |
| Low-Voltage Sub-Permit |
OPEN • UNBOUGHT (Division 28 subcontract unassigned) |
| Property Profile & Standard |
Class-A Trophy High-Rise (55 Stories). Demands enterprise-grade tenant card access standards and UL-listed commercial hardware. |
| Buyout Window Estimate |
45 to 65 days before framing and in-wall electrical rough-in commences. |
Live Municipal Lifecycle Timeline (Audit Provenance)
Div28.ai monitors municipal databases continuously. All status transitions, GC attachments, and sub-permit filings are recorded with timestamped audit trails:
Layer 3: Security Scope & Hardware Takeoff (BOM Sizing)
- Perimeter & Suite Entry: 4 to 6 card reader doors with electrified mortise locks and REX sensors.
- Executive & Conference: 8 to 12 scheduled access openings with privacy toggles.
- Server / MDF: Dual-authentication card + biometric readers with temperature alarms.
- Interconnecting Stair: Fail-safe electrified stairwell re-entry hardware.
- Elevator Lobby: 2x 4MP WDR indoor minidomes covering elevator arrival bank.
- Reception & Entry: 2x 4MP low-light dome cameras facing reception desk.
- Conference Center: 4x 360-degree panoramic ceiling cameras.
- Circulation & Corridors: 6x Corridor-view high-definition minidomes.
System Platform Compatibility: Software House C•CURE 9000, Genetec Security Center, or LenelS2 OnGuard matching building property management baseline.
Layer 4: Precon Battle Plan & Direct Contacts
Recommended Outreach Action & Opening Move
Contact the prime general contractor's interiors estimating desk prior to electrical trade buyout. Reference permit record and submit your branch qualification statement for Division 28 electronic security.